Rechnungswesen vom 3 April 2008
Alle Angaben ohne Gewähr xD
Kalkulationszuschlag= (LVP-BP)*100/BP
Handelsspanne= (LVP-BP)*100/LVP
|
LEP |
|
147,12€ |
|
LRAB |
1% |
1,47€ |
|
ZEP |
|
145,65€ |
|
LSKTO |
- |
- |
|
BEP |
|
137,2€ |
|
BK |
8,45 |
8,45€ |
|
BP |
|
145,65€ |
|
HK |
25% |
36,41€ |
|
SEKO |
|
182,06€ |
|
GEW |
12,5% |
22,76€ |
|
BVP |
|
204,82€ |
|
KSKTO |
2% |
4,18€ |
|
ZVP |
|
209€ |
|
KRAB |
5% |
11€ |
|
LVP |
|
220€ |
3)
Handelsspanne= (220-145,65)*100/220=33,80
Kalkulationszuschlag=(220-145,65)*100/145,65=51.05
4)
|
LEP |
280 |
280 |
|
LRAB |
34,40% |
96,33 |
|
ZEP |
|
183,67 |
|
LSKTO |
2% |
3,67 |
|
BEP |
|
180 |
|
BK |
20€ |
20 |
|
BP |
|
200 |
|
HK |
20% |
40 |
|
SEKO |
|
240 |
|
GEW |
16 2/3 |
40 |
|
BVP |
|
280 |
|
KSKTO |
- |
|
|
ZVP |
|
|
|
KRAB |
- |
|
|
LVP |
280 |
280 |

Eine Antwort schreiben